PORTFOLIO // CLIENTS

LA Metro

Freeway Optimization

I-405 Auxiliary Lanes (Wilmington to Main)

Eliminating a chronic freeway bottleneck. By reconfiguring weaving and merging operations on one of the busiest highway segments in the nation, this project directly targets peak-hour congestion, enhancing safety and travel time reliability for the South Bay logistics corridor.

Corridor Mobility // The Arteries

$

55

MN

COST

BRT Conversion

G Line Improvements Project

Executing critical grade separations and rail-ready infrastructure for the 2028 Olympics. This is not just a transit upgrade; it is a timeline-critical mobilization to slash travel times by 12 minutes and secure the primary transit artery of the San Fernando Valley before the world arrives.

Heavy Infrastructure // The Backbone

$

668

MN

COST

Historic Rail Hub Transformation

Link Union Station (Phase A)

Securing the evolution of Southern California’s largest transit hub. Working in a live rail environment with active passenger flows, we provide the CMSS oversight necessary to transform Union Station from a stub-end terminal to a modern run-through concourse without disrupting daily operations.

Transit & Corridor // The Arteries

$

3

BN+

COST

2026 World Cup & 2028 Olympics Planning

Transit-First Fan Zone Strategy

Architecting the operational framework for the world’s largest mass-gathering events. We are embedded with executive leadership to develop the "Transit-First" strategy, ensuring the seamless integration of high-threat fan zones with critical transit infrastructure. Our role bridges the gap between public safety, operational logistics, and stakeholder alignment for the region’s defining international moments.

$

42

MN+

COST