PORTFOLIO // CLIENTS

City of Los Angeles

Resilience Infrastructure

Donald C. Tillman Advanced Water Equalization Basins

Securing the region’s water future. This project creates 30 million gallons of wet-weather storage capacity, integrating critical seismic resilience and operational flexibility to protect local waterways and ensure the reliability of Los Angeles’ water reclamation systems.

Heavy Infrastructure // The Backbone

$

100

MN

COST

Event Readiness

2028 Olympics - Pico/Flower First-Last Mile

Preparing the ground for the global stage. We are designing the critical "First/Last Mile" pedestrian connections for the 2028 Olympic Games, ensuring safe, high-volume access between major transit hubs and the primary venues in downtown Los Angeles.

The Network // Active Connectivity

$

5

MN

COST